SOM Easy Build crew working in a retail space under construction during a tenant improvement build

Tenant Improvement Contractor · Southern California

Commercial build-outs, delivered to the brand standard — and to the opening date.

SOM Easy Build delivers complete tenant improvement build-outs for national retail, coffee, apparel, fitness and healthcare brands across all of Southern California — San Diego to Ventura, Palm Springs to the coast.

Licensed & Bonded$5M Liability InsuredMulti-Site RolloutsNight & Weekend Crews

Brands we have delivered TI build-outs for

adidasT-MobileChipotleKaiser PermanenteVerizon
640+TI projects energized
7Counties covered
96%On-time opening rate
40Field electricians

Explained

What is a TI project?

TI stands for tenant improvement — the construction work that turns an empty or outdated commercial space into a finished, code-compliant store, restaurant, clinic or gym for a specific tenant. The landlord delivers the shell; the tenant improvement build makes it operate.

A TI build runs demo, framing and drywall, ceilings, power and lighting, low voltage, millwork installation, paint and final finishes — then closes with Title 24 documentation and the inspections that release the certificate of occupancy. Miss a step and the opening date moves.

  • Shell vs. TI. The base building gives you a slab, walls and a utility stub. Everything a brand actually needs — panels, circuits, lighting, data, signage power — is TI scope.
  • Driven by a brand prototype. National tenants build from a standard drawing package: fixed fixture types, photometrics, device heights and equipment schedules that must be matched exactly.
  • Fixed, public deadline. Rent, staffing and marketing are already committed to an opening day, so the schedule is worked backwards from inspection, not forwards from demo.
  • Often in a live center. Malls, grocery anchors and medical buildings stay open, so work happens on night shifts with landlord rules, badging and daily clean-up.
New panels, switchboard and conduit runs installed in a commercial electrical room during a tenant improvement build

What we do

Complete scope for tenant improvement.

One contractor from demo to final inspection: framing and drywall, ceilings, power and lighting, low voltage, paint, finishes and utility coordination — priced from your brand's standard drawing set.

Power & Distribution

New services, switchgear, panels, transformers, subfeeds and load calculations — plus utility coordination with SCE, LADWP and SDG&E.

  • Switchgear
  • Panels
  • Feeders
  • Load calcs

Lighting & Controls

Track, linear, cove, display and case lighting built to brand photometrics, with Title 24 compliant controls, dimming and daylight sensors.

  • Title 24
  • Dimming
  • Sensors
  • Emergency egress

Low Voltage & Data

Structured cabling, POS and kiosk drops, Wi-Fi access points, CCTV, access control, audio and digital menu boards — tested and certified.

  • Cat6/6A
  • POS drops
  • CCTV
  • Access control

Framing, Drywall & Ceilings

Metal stud framing, demising walls, drywall hung, taped and finished, hard lids, acoustical grid and bulkheads built to the prototype set.

  • Metal studs
  • Level 4/5 finish
  • Grid ceilings
  • Bulkheads

Paint, Finishes & Millwork

Brand-spec paint and wall covering, flooring, tile, storefront glazing, millwork and fixture installation — punch-listed to the finish schedule.

  • Brand paint spec
  • Flooring
  • Millwork set
  • Punch list

Signage & Storefront

Channel letters, blade signs, illuminated storefronts and drive-thru menu power, coordinated with your sign vendor and landlord criteria.

  • Channel letters
  • Timers
  • Storefront
  • Drive-thru

Equipment Hook-Up

Kitchen line, refrigeration, HVAC, ovens, espresso, fitness equipment and medical devices — connected, commissioned and documented.

  • Kitchen
  • Refrigeration
  • HVAC/RTU
  • Commissioning

Rollouts & Ongoing Service

Repeatable scopes across dozens of locations, plus 24/7 emergency service, EV charging and retrofit programs for existing stores.

  • Rollouts
  • Retrofits
  • EV charging
  • 24/7 service

Our work

TI builds across Southern California.

Retail, food service, fitness, healthcare and telecom — from 1,200 sq ft inline stores to 42,000 sq ft anchor spaces.

Sportswear store build-out with display walls framed and accent lighting installed

Santa Monica · LA County

adidas

Two-level concept store: track and accent lighting to brand photometrics, AV and digital wall power, POS and stockroom data.

9,600 sq ft11 weeksOccupied mall

Telecom store build-out with drywall finished and ceiling lighting installed

San Diego · UTC

T-Mobile

Storefront rebuild with backlit display walls, table power grommets, structured cabling for 40 devices and new panel.

3,200 sq ft5 weeksRollout site 6 of 14

Fast-casual restaurant build-out with kitchen line set and lighting energized

Riverside · Inland Empire

Chipotle

Full kitchen hook-up: hood interlocks, line equipment circuits, walk-in refrigeration, dining lighting and health-department sign-off support.

2,400 sq ft7 weeksDelivered 3 days early

Medical clinic build-out with corridor drywall finished and exam room lighting installed

Ontario · San Bernardino County

Kaiser Permanente

Outpatient clinic TI: essential and normal branch circuits, exam room device power, nurse call, imaging equipment feeds, OSHPD documentation.

12,700 sq ft18 weeksHealthcare compliance

Project descriptions are representative examples of tenant improvement scopes. All brand names are the trademarks of their respective owners and are shown to indicate project type; they do not imply endorsement. Full references and license verification available on request.

How we deliver

Five stages, built around your opening date.

A dedicated project manager, a look-ahead schedule and weekly photo reports — so the GM, the GC and the brand team all see the same status.

01

Bid & Takeoff

We review the drawing set and brand standards, then return a line-item bid with RFIs and value options — typically in 5 business days.

02

Preconstruction

Permit support, utility applications, Title 24 forms, gear procurement and long-lead tracking before mobilization.

03

Rough-In

Conduit, feeders, boxes and lighting layout coordinated with the GC's schedule, plus night work in occupied centers.

04

Trim & Test

Devices, fixtures, controls programming, equipment hook-up, low-voltage certification and megger testing.

05

Inspection & Turnover

Final AHJ inspection, panel schedules, as-builts, warranty package and a punch list closed before opening day.

SOM Easy Build foreman and project manager reviewing construction drawings on site

Who we are

A build team that speaks GC and brand standard.

SOM Easy Build is a licensed commercial contractor built specifically around tenant improvement work. Forty field tradespeople, our own prefab shop, and project managers who have run national rollouts before.

  • Licensed, bonded, insured. Active California contractor's license, contractor's bond, $5M general liability, full workers' comp and OCIP-ready documentation. License details provided with every bid package.
  • Brand-standard fluency. We build from national prototype packages and hold the finish, fixture and photometric spec without redlines.
  • AHJ & utility experience. LADBS, LA County, San Diego, Orange County and Inland Empire jurisdictions plus SCE, LADWP and SDG&E coordination.
  • Schedule discipline. Night and weekend crews at no premium markup on rollout agreements, and a 2-year workmanship warranty in writing.

Coverage

All of Southern California, one contractor.

Crews dispatched statewide — same-week mobilization anywhere in California.

Los Angeles County

Downtown LA, Burbank, Glendale, Pasadena, Santa Monica, Long Beach, the Valley and South Bay.

Orange County

Costa Mesa, Irvine, Anaheim, Santa Ana, Huntington Beach, Newport Beach and Brea.

San Diego County

Downtown San Diego, UTC, Carlsbad, Chula Vista, Escondido and Oceanside.

Inland Empire

Riverside, San Bernardino, Ontario, Rancho Cucamonga, Temecula and Palm Springs.

Ventura County

Ventura, Oxnard, Thousand Oaks, Camarillo and Simi Valley.

Santa Barbara

Santa Barbara, Goleta and Santa Maria for retail and restaurant TI.

Kern County

Bakersfield and Tehachapi corridor sites on rollout programs.

Multi-site programs

Statewide rollouts managed from one point of contact with standardized pricing.

Our assets

Equipment we own and dispatch.

No waiting on rental yards mid-schedule. Trucks, lifts, prefab capacity and test instruments are in-house, so crews mobilize the same week and night shifts are not blocked by equipment.

Company work vans, flatbed truck, scissor lift and boom lift parked in the contractor yard

Fleet & access equipment

Service vans stocked to a standard inventory list, flatbed trucks for gear and conduit delivery, plus our own scissor and articulating boom lifts for high-bay and mall ceiling work.

  • 18 service vans
  • 3 flatbed trucks
  • Scissor lifts 19–32 ft
  • Boom lift 45 ft
  • Material hoists
Prefabrication shop bench with pipe bender, wire spools, pre-cut conduit and labeled fittings bins

Prefab shop & tooling

A dedicated Burbank prefab shop where racks, whips, panel feeds and fixture assemblies are built and labeled before they reach the site — fewer field hours, less jobsite clutter.

  • Benders to 4"
  • Cable pullers
  • Threading machines
  • Kitted assemblies
  • Bar-coded materials
Field crew reviewing drawings and using a tablet on a tenant improvement jobsite

Test, safety & field tech

Calibrated instruments for commissioning and closeout documentation, plus tablets in every crew truck so RFIs, photos and as-builts move the same day they happen.

  • Insulation testers
  • Power quality meters
  • Thermal imaging
  • Arc-flash PPE
  • Temp power & generators

Equipment list reflects owned assets; specialized gear such as large cranes and high-reach lifts is rented per project and included in the bid.

Industry news

What is moving TI costs and schedules.

Reporting we track because it shows up in bids: fit-out pricing, labor availability, gear lead times and California code changes.

Cushman & Wakefield

2026 U.S. Retail Fit Out Cost Guide

Benchmark build-out costs per square foot by retail format and market — the reference we use when brands set early TI budgets.

August 5, 2026 · cushmanwakefield.com
JLL

2026 midyear U.S. construction perspective

Midyear read on material pricing, labor cost escalation and where commercial construction demand is heading into 2027.

July 7, 2026 · jll.com
Reuters

Data center rush worsens shortages of power and grid workers

Data center demand is absorbing electricians and electrical gear nationally — a direct driver of switchgear lead times on retail projects.

May 18, 2026 · reuters.com
Qmerit

America's electrician shortage in 2026

Why licensed electrician supply is tightening and what it means for contractor capacity, wages and crew planning.

June 8, 2026 · qmerit.com
inside.lighting

California tightens Title 24 lighting code again

Stricter lighting power and control requirements change fixture selection and commissioning paperwork on every California TI.

August 26, 2025 · inside.lighting
CoStar Group

U.S. retail construction activity holding near post-pandemic lows

Little new retail space is being built, which pushes brand growth into tenant improvement of existing centers.

2026 · costargroup.com
Terrapin CG

Tenant improvement cost per square foot in 2026

Current per-square-foot ranges for commercial and retail build-outs, broken down by scope level.

March 30, 2026 · terrapincg.com
WCG · AGC/NCCER survey

2026 construction workforce survey: shortages and retention

Industry survey data on craft labor shortages and first-90-day retention — the reason crew continuity is written into our rollout agreements.

September 4, 2026 · buildwcg.com

Headlines link to third-party publications. SOM Easy Build is not affiliated with these outlets and shares the coverage for reference only.

What partners say

General contractors and brand PMs.

★★★★★

“Gear lead times blew up mid-project. SOM sourced an alternate switchboard, got it approved by the engineer, and we still turned the store over on the original date.”

Project Executive — National retail GC, Irvine
★★★★★

“Fourteen stores in eleven months across three counties. Same crew leads, same submittals, no surprises on any invoice.”

Construction Manager — Telecom rollout program
★★★★★

“They ran our grocery remodel overnight for four months and the store never lost a single sales day. That's rare.”

Regional Facilities Director — Grocery chain

Questions

Before you send the bid set.

Are you licensed and insured for commercial work?

Yes. SOM Easy Build holds an active California contractor's license and carries a contractor's bond, $5M general liability with umbrella coverage, and full workers' compensation. License details, certificates of insurance, W-9 and safety records are provided with every bid package.

What size TI projects do you take?

From 1,200 sq ft inline stores to 40,000+ sq ft anchor spaces and multi-site rollout programs. Typical contract values run from $60K to $2.5M.

How fast can you turn a bid?

Five business days for a standard retail or restaurant TI package, two to three days for repeat prototype scopes we have already built. Budget numbers for early pricing can be same-week.

Do you work nights and weekends in occupied centers?

Yes. We run dedicated second-shift crews for malls, grocery and live-store remodels, with landlord coordination, badging and noise-window compliance handled by our PM.

Do you handle permits, Title 24 and utility applications?

Yes. We manage permit submittal, Title 24 lighting compliance forms, inspections through final sign-off, and utility service applications with SCE, LADWP, SDG&E and Anaheim Public Utilities.

Can you take low voltage and signage in the same contract?

Yes. Structured cabling, POS and Wi-Fi drops, CCTV, access control, AV and illuminated signage power can all be bid within a single scope so you manage one contractor.

How do you handle change orders?

Every change order is priced with labor hours, material and schedule impact, submitted before the work happens, and requires written approval. No back-charges at closeout.

Get started

Send us the drawing set.

Upload or email your bid package and we will return a line-item proposal with RFIs, long-lead items and a schedule within five business days.

Main office

35315 Aubrey Ln
Beaumont, CA

Yards

All California

Hours

Mon–Fri 6:30 AM – 6:00 PM · 24/7 emergency service

We respond within one business day. Drawing sets can be emailed to estimating@someeasybuild.com.

Thank you — your request is in. An estimator will contact you within one business day.